Course «Professional Tester» Has Been Completed

Acceptance Tests of the Supply Set Power Supply System for Reactor Control and Protection System and Unitized Transformer Substation-1000-10 Have Confirmed the Compliance with All Requirements
12.07.2019
NPP Fire Safety Assurance is Radiy’s First Priority
29.07.2019
Acceptance Tests of the Supply Set Power Supply System for Reactor Control and Protection System and Unitized Transformer Substation-1000-10 Have Confirmed the Compliance with All Requirements
12.07.2019
NPP Fire Safety Assurance is Radiy’s First Priority
29.07.2019