Acceptance testing of automatic power controller and power limiting device and accelerated preventive protection for SS South Ukraine NPP
10.04.2019Municipal investment forum “TIME to INVEST” in Kropyvnytskyy
28.05.2019During the period from 06.05.2019 to 08.05.2019, a committee conducted standard testing of a unitized transforming substation developed and manufactured by PC NPP “Radiy.”
The purpose of the testing was to assess the effectiveness and necessity of proposed changes to the specification.
Test results confirmed that the proposed changes are necessary.