From 08/04/2019 to 10/04/2019, a commission performed acceptance testing of automatic power controller and power limiting device and accelerated preventive protection for unit 3 of SS SUNPP.
The commission concluded that the equipment complies with nuclear and radiation safety standards, is functional, and correctly operates in all modes.
The equipment will be shipped to the SS SUNPP in May 2019.