During the period from 06.05.2019 to 08.05.2019, a committee conducted standard testing of a unitized transforming substation developed and manufactured by PC NPP “Radiy.”
The purpose of the testing was to assess the effectiveness and necessity of proposed changes to the specification.
Test results confirmed that the proposed changes are necessary.