14th International Conference on Dependability of Computer Systems DepCoS 2019
05.07.2019Course «Professional Tester» Has Been Completed
17.07.2019During the period of July 8th-Jully 12th 2019, acceptance tests were performed on a supply set of Power Supply System for Reactor Control and Protection System of a power unit No. 3 of SS SUNPP developed and manufactured according to the “Terms of Reference For the Development, Manufacture, Acceptance and Supply of Power Supply System for Reactor Control and Protection System of power units No. 3 of SS SUNPP and No. 4 of SS RNPP”.
Acceptance tests were carried out the RPC Radiy site according to the program and procedure of the «Power Supply System for Reactor Control and Protection System of a power unit No. 3 of SS SUNPP and No. 4 of NPP RNPP. Program and Procedure of Acceptance and Acceptance Tests».
On July 9th, 2019, acceptance tests of the Unitized Transformer Substation-1000-10 (section 3CR10), developed and manufactured by PC «RPC Radiy» were performed at the site of PC «RPC Radiy», Kropyvnytskyy.
The test results of the supply set of Protection System and Unitized Transformer Substation-1000-10 have confirmed the compliance of presented equipment with the requirements of specifications, design documentation, technical requirements and supply contracts. The technical level and quality of manufacturing the supply set of Protection System and Unitized Transformer Substation-1000-10 meet the criteria given in regulatory documents on nuclear and radiation safety and other papers valid in Ukraine.