New Equipment for Khmelnitsky Nuclear Power Plant
06.02.2020DESSERT 2020: setting high standards, no matter what
18.05.2020During the period of February 19 -21, 2020, Factory Acceptance Tests of the supply set of a Power Supply System of the Reactor Control and Protection System for the Power Unit № 5 of Separated Subdivision "Zaporizhzhia Nuclear Power Plant" were completed. This supply set was designed and manufactured in accordance with the approved Terms of Reference for development, manufacture, acceptance and delivery of the Power Supply System of Reactor Control and Protection System for power units № 4 and 5 of the Separated Subdivision "Zaporizhzhia Nuclear Power Plant". The acceptance tests were performed at the test site of RPC Radiy involving Customer’s representatives.
The test results confirmed the conformity of the Power Supply System of Reactor Control and Protection System for the Power Unit № 5 of Separated Subdivision "Zaporizhzhia Nuclear Power Plant" with the criteria and requirements specified in the Terms of Reference. The acceptance committee noted that the system remains operational and functions well in all operating modes provided for in the Terms of Reference. Additionally, it fully complies with the requirements of Ukrainian regulatory documents.
The system will be shipped to the Customer at the time specified in the Supply Agreement.
RPC Radiy once again confirms its reputation as a reliable supplier of equipment for Ukrainian nuclear power plants.