On April 30th, Radiy provided the training "How are you?" for its employees. The participants used the opportunity to delve deeply into the psychological support for mental health.
April 12, 2024 - Radiy/Radics completed the Factory Acceptance Test of Reactor Control and Protection System for VVER-1000. The System is designed and manufactured for Power Unit 5 of Kozloduy NPP, Bulgaria and consists of a Reactor Trip System, Reactor Power Control System and Reactor Power Discharge and Limitation Equipment.
On April 24, 2024 Exida Certification LLC - the company that previously certified Radiy’s FPGA-based safety Controller (FSC) RadICS to SIL 3 in one channel in compliance with IEC 61508 – completed a Surveillance Audit to extend certification for another 3 years.
Two-day testing of a single-turn electric actuator developed for Power Unit 4 of the Rivne NPP was successfully completed at the radiy test site. The tests followed a comprehensive program addressing all key aspects of the equipment's functionality
This advanced equipment was designed and manufactured according to customer’s specification to replace the outdated system at Power Unit 1 of Rivne NPP
The comprehensive testing of the electrical equipment was conducted by the letter of the South Ukraine NPP and was aimed to fulfill the terms of the supply agreement
The results confirmed the compliance of the equipment and its documentation with all current regulations. The cabinets are going to be timely delivered to the Customer.