September 21-23, 2022, prototypes of LED industrial luminaires were tested at RPC Radiy’s site. The luminaires have been designed and manufactured by RPC Radiy
The Chairman of the Supervisory Board of RPC Radiy Ievgenii Bakhmach and the Chief Executive Officer of Radics LLC, Kateryna Bakhmach, took part in the 7th Central & Eastern Europe Nuclear Industry Congress ( hereinafter Congress), which was held from September 12 to September 13, 2022 in Prague, Czech Republic
Remote Acceptance tests of the Modified Software Package (MSP) for the software and technical set of the Reactor Trip System operating at the Power Unit #3 of the Rivne Nuclear Power Plant
RADIY is working hard to win. Our front is providing cost-effective equipment of highest quality to keep the energy infrastructure of our country working. Systems and equipment manufactured by Radiy are domestic products that contribute to the economy of the country and its independence in energy generation
On February 1, a 6-hour training was conducted for Radiy employees to introduce "Requirements of the international standard ISO 14001:2015. Risk management. Internal Audit"
On December 23, the set of Safety-Related Conventional Island I&C System (SR CI I&C System), designed and manufactured for Power Unit № 1 of Rivne NPP, successfully passed acceptance tests at Radiy testing ground