Position Signaling Mechanisms for Khmelnitsky NPP are ready for on-site operation

The Steam Generator Control System for the Rivne NPP has passed all tests

27.11.2025

Comprehensive Type Tests for Signal LED-Light Fixture ASKM-S-R

03.12.2025