Testing and Acceptance of Equipment for Rivne NPP

MSP_9699
Position Signaling Mechanisms Undergo Acceptance Testing
19.07.2024
Acceptance testing for the VVER-1000 Reactor Control and Protection System (RPS) based on RadICS Platform has been completed at Kozloduy NPP, Bulgaria
26.08.2024