news en

18.09.2020

Equipment FAT for Power Unit 3, South Ukraine NPP Successfully Completed

Radiy experts successfully completed witness Factory Acceptance Testing (FAT) for Supply Set 3 of the Engineered Safety Features Actuation System (ESFAS-1)
17.09.2020

First Surveillance Audit of Radiy’s Quality Management System

Quality Austria performed the first surveillance audit of RPC “Radiy” QMS for its effectiveness assessment, viability and conformance to the requirements of the International Standard ISO 9001:2015
03.09.2020

Radiy Is Recognized for the Important Contribution to the Kirovograd Region Economy

As a part of celebration of the Ukrainian Entrepreneur Day, there was a ceremonial meeting in the regional state administration with participation of business representatives of the Kirovograd region, the regional administration, the Ukrainian Chamber of Commerce, and the regional association of employers and the regional branch of the Ukrainian Union of Industrialists and Entrepreneurs
27.08.2020

Radiy’s Professional Activity and Contribution to Nuclear Industry Approved by the President of Ukraine

Volodymyr Zelenskyi, the President of Ukraine, got acquainted with products and manufacturing capabilities of RPC Radiy
23.07.2020

Level Alarm Modules are ready for delivery to Rivne NPP

Level alarm modules (LAM) were successfully tested in compliance with FAT requirements and procedures
10.07.2020

Newly certified FPGA Platform is Radics strategic vision to the future

The RadICS Platform Topical Report was revised to reflect the addition of three new modules
27.05.2020

Witness Testing for RadICS Newly-Developed Modules

Radiy subjected three newly-developed modules: TIM (Thermocouple Inputs Module), RIM (Resistance Temperature Detector Inputs Module), WAIM (Wide Range Analog Inputs Module) for witness testing as well as updated software to configure RadICS platform and provide online monitoring to its components
27.05.2020

Business as Usual During Covid-19

The results of preliminary testing and FAT demonstrated that the Radiy equipment meets all the nuclear safety requirements and standards on nuclear safety and can be delivered to Rivne NPP.
26.05.2020

New Equipment From Physical Processes Analysis Design Group

Factory Acceptance Testing (FAT) occurred on the prototype of a multi-purpose current-operated distributor (COD) designed and developed by Radiy’s Physical Process Analysis Design Group